Embassy Gardens

Structural Steelwork
The fabrication and installation of a 500 tonne vierendeel truss bridge to span between two new residential towers in Embassy Gardens at levels 8 to 12.

Custom House Station

Structural Steelwork
The fabrication and installation of a new bridge over the DLR line, entrance staircase, bridge over Victoria Dock Road to the new Crossrail Station and support steelwork for the stations ETFE roof.

Wood Wharf

Temporary propping
The provision of detailed design, fabrication and installation of a temporary tie system to restrain the existing ‘secant wall’ during the excavation of foundations and basement works.

Victoria Station

Structural Steelwork
The fabrication and installation of ground floor support and ticket hall entrance structure.

Kennington, Acoustic Sheds

Structural Steelwork
The design, fabrication and installation of two Acoustic Sheds at Kennington Green and Kennington Park, to mitigate noise from tunnelling as part of the London Underground Northern Line Extension.

Tottenham Court Road Station

Temporary propping
The manufacture, delivery and installation of 1,100 tonnes of temporary propping.

Battersea Power Station

Support Steelwork
The supply and installation of nine temporary façade retention towers and two frames to allow work to start on the dismantling and rebuilding of the Grade II listed Annex A and Turbine Hall A to modern specifications.

Kensington, New Design Museum

Support Steelwork
The supply and installation of temporary support steelwork to facilitate the refurbishment of existing Commonwealth Institute into a new Design Museum

Canary Wharf Station

Structural Steelwork
The fabrication & installation of ship protection fenders and a ‘U’ Tube for underwater cables at the new Canary Wharf Station.