The second phase of the Battersea redevelopment providing 39,500m2 retail & events space on the lower floors with 58,000m2 of offices above and crowned by 248 flats on the site of the old Power Station.

Client:    Keltbray Group Ltd
Contract Value:  £686,000

DAM Structures were contracted to supply and install nine temporary façade retention towers and two frames to allow work to start on the dismantling and rebuilding of the Grade II listed Annex A and Turbine Hall A to modern specifications.

Due to the temporary towers requiring fitting within the existing steelwork we undertook a detailed survey of the site prior to starting steelwork detailing and installation planning. This prior planning ensured that once on site the installation went ahead to programme.

A BIM model was provided to the client’s design team to permit the steel towers to be incorporated into the master site model allowing for a coordinated design approach.

Due to the age and previous designation of the building all our staff underwent asbestos training prior to starting work on site.

Existing steelwork Turbine Hall - website          Annex A Facade Retention Tower - website