Over the years, DAM Structures have worked on many
wide-ranging projects in the UK and across Europe. Through each of these
projects we have gained valuable experience and increased our reputation
as a flexible, forward-thinking company. Samples of some of the projects
undertaken by DAM Structures are as follows:
- London
Heathrow Terminal 5 Development
Terminal 5
is one of the largest construction projects in the UK. It is a huge and
complex construction programme, including the construction of a terminal
building, 41 aircraft stands, two satellites, a 4,000 space multi storey
car park, a new control tower, and transport links. The work encompasses
civil engineering, building, highway engineering, mechanical &
electrical engineering, tunnelling, railway engineering, specialist
systems technology including a complex baggage handling system and a
track transit system (people mover), and project logistics management.
DAM Structures have worked extensively in conjunction with Morgan Vinci
on the groundworks and major structures phases of this development.
- Channel
Tunnel Rail Link (Contract 320)
The works involved the construction of the CTRL
route, at Swanscombe in Kent. One of the principle elements of the works
is the Thames Bored Tunnels. DAM Structures Ltd worked with HMJV in the
construction, maintenance and operatives of all surface plant: all pipe
work and support structures were fabricated and updated as work
progressed. Our certified welders and fitters carried out all works.
- Elstreet to
St. John's Wood Cable Tunnel
This was major infrastructure project undertaken by
the National Grid Company to upgrade and secure the power supply into NW
London to meet growing consumer need. It involved the construction of a
20 km long tunnel from Elstree in Hertfordshire to St. Johns Wood in the
London borough of Westminster. This tunnel consists of 3.05 ID concrete
segment lined tunnel with 6 No permanent shafts up to 42 m deep with
access to buildings at ground level. DAM Structures worked in conjunction
with J. Murphy & Sons for the erection of surface plant, including
extensive maintenance work on TBM. We have maintained and adapted rolling
stock and conveyers for the length of the project. All work was carried
out by certified welders and fabricators.
- Limerick Main
Drainage (Contract 3.1)
The Limerick Main Drainage Scheme (Ireland) is a
major environmental and infrastructural project which provides a new
drainage system and treatment facility for the city and its surrounding
area. This project involves the construction of 2.55 km of 2.82m ID
segmentally lined tunnel. 13 segmentally lined shafts sunk to depths of
15 m will provide both access and connection points for existing sewers.
DAM Structures Industrial Services was involved with the erection of
surface and support plant equipment, fabricated launching frames and pipe
work. All welding was 100% tested.
- Canary Wharf
DAM Structures has played a significant role in the
construction of Canary Wharf (DS4 and HQ5). The role included extensive
site welding and fabricating.
- Royal Albert
Hall
Steel structuring work of the major refurbishment
of the Royal Albert Hall.
- Tibury Docks
The erecting of the two largest dock cranes at
Berth 39 Tilbury Docks for Baldwin's cranes. All welds were 100% tested.
- Waterway
between Billings Gate and DS4 Canary Wharf
The welding and construction of 2 no. steel framed
road bridges spanning a busy waterway between Billings gate and DS4
Canary Warf.